Skip to content

MATGAS Review / Field notes 2026

Campus UAB, Bellaterra

MATGAS 2000 A.I.E. / Research
Research review / 2026

Materials and gases, studied together. An independent centre for CO2, energy and clean processes.

Laboratory

Industrial Scaling

A pilot area for taking a laboratory process to a size where its behaviour can be observed.

What this laboratory does

The Industrial Scaling laboratory is dedicated to moving processes from laboratory scale to pilot plant size. It covers 150 square metres, divided into a 50 square metre assembly area and a 100 square metre pilot zone that is 9 metres high. The height allows semi industrial extraction, distillation and fractioning columns to be installed and operated safely.

Capabilities

Pilot plant area100 square metres with 9 metre headroom
Assembly area50 square metres for rig building
ColumnsExtraction, distillation and fractioning
Safe accessTwo walkways at different heights

Methods and equipment

  • Pilot scale extraction and distillation
  • Fractioning columns
  • Process instrumentation and sampling
  • Rig assembly and modification
  • Safe working at height

Research lines served

This laboratory supports work across the following research lines. A project may use the laboratory for a single measurement or for a long programme of work.